Wednesday, July 27, 2011
Thanks to the help of some wonderful ladies, we began painting the siding last Friday afternoon. We began around 3pm and continued into the darkness with work lights. A sincere thanks to Faith Wood, Liz Harty, Shelby Harty and Jess Nichols. We painted about 1/2 of the siding: the 1st coat. We olan to apply the 2nd coat once the boards have been nailed to the house.
Thursday, July 21, 2011
Bill Doran (Mike's dad) has been priming all of the exterior siding, both front and back. It has been extremely hot (high 90's), so we are extra grateful for his dedication. The electrician came and installed all the wiring last week. This week the plumber began. The upstairs tub has been installed. The doors and windows arrived on Wed. evening. All of the widows were install today. Josh began working on building the staircase to the second floor. Mike and he have come up with a nice design.