Thursday, July 21, 2011

Bill Doran (Mike's dad) has been priming all of the exterior siding, both front and back. It has been extremely hot (high 90's), so we are extra grateful for his dedication. The electrician came and installed all the wiring last week. This week the plumber began. The upstairs tub has been installed. The doors and windows arrived on Wed. evening. All of the widows were install today. Josh began working on building the staircase to the second floor. Mike and he have come up with a nice design.