Wednesday, July 27, 2011
Thanks to the help of some wonderful ladies, we began painting the siding last Friday afternoon. We began around 3pm and continued into the darkness with work lights. A sincere thanks to Faith Wood, Liz Harty, Shelby Harty and Jess Nichols. We painted about 1/2 of the siding: the 1st coat. We olan to apply the 2nd coat once the boards have been nailed to the house.
Thursday, July 21, 2011
Bill Doran (Mike's dad) has been priming all of the exterior siding, both front and back. It has been extremely hot (high 90's), so we are extra grateful for his dedication. The electrician came and installed all the wiring last week. This week the plumber began. The upstairs tub has been installed. The doors and windows arrived on Wed. evening. All of the widows were install today. Josh began working on building the staircase to the second floor. Mike and he have come up with a nice design.
Monday, July 11, 2011
Let's see-things are really moving fast. Last weekend Mike and Josh put on the roof with the help of a few more volunteers. This past week Bill and Josh worked on finishing the second layer of insulation. They also completed the strapping. Mike is working on the stair design to the second floor. And lastly the electrician has pretty much finished up all the the wiring. Pretty amazing...
Tuesday, June 28, 2011
We  purchased a small pop-up camper in May. We  decided it would be nice to have a camp-like spot up at the land.  Each  week we add a little more to make it comfortable. A screen tent, chairs,  Mike’s hand crafted picnic table and a few tiki torches. We spent a  night up there two weekends ago with the girls and the dogs. It was amazing to be in the spot  during the night. So private and lots of wildlife signs. We plan to camp  out more this summer.
Bill  Snow (my dad) has been coming once a week to work with Mike. Bill  Doran (Mike’s dad) has been working 5 days a week now that he has  retired from teaching. A few weeks ago we had a bunch of friends and  family come up to the house site and help raise the bents followed by a celebratory BBQ. A  speical thanks to Ed Harty (& family), Josh Rouke, Daire Gibney,  Josh Nichols, Devin Gallagher, Bill Snow and Bill Doran.
Sunday, June 26, 2011
After  the foundation was complete, Mike waterproofed the walls and then he  insulated the walls. He also installed radiant flooring. Butch returned  and began to back fill around the basement. He and his son also spent  time shaping the land and removing more stumps. It was an exciting  process to watch as we could finally see what our yard would look like.  We had temporary power installed as well.
Mike  decided to hire Seldon Lund from Walpole, NH to install our foundation  and walk out basement. Mike has known Seldon most of his life. We were  happy to hire him and he proved to do an excellent job. He arrived on  May 20th to pour the footings The next day he set the forms. May 27th  the foundation was poured. 
Parker Water Wells from  Middletown Springs, VT arrived on May 18th. They began the well  installation for us. Our well was over 600' deep. We had to hydrofrack.  The yield was under a gallon a minute even at that depth. It now yields  5 gallons per minute. Although it wasn’t what we were hoping for we are  pleased to have water.
Butch Wilson Excavating
A new beginning...
We  have wonderful news! We sold our home in Andover at the end of  February. Yippee! We currently live at Mike’s dad’s home. We are  eternally grateful that he opened his home and his way of life to our  very active life with two young girls and two dogs. 